=The Harlem River Tunnel.=--The pneumatic caissons method was employed
in the construction of the tunnel under the Harlem River for the New
York Rapid Transit Railway. The tunnel proper consisted of two parallel
tubes riveted to each other and surrounded by a cradle of concrete as
shown in Fig. 121, page 216. The tunnel was built in three
sections:--The first, from the Manhattan shore well towards the middle
of the river; the second, from the shore of the Bronx towards the middle
of the river; and the last, the section uniting the other two and
completing the tunnel.
Each section was built within a specially constructed working-chamber,
consisting of timber side walls forming a wooden caisson, so constructed
that compressed air could be used. This working-chamber of Mr. McBean
presented some novel features, inasmuch as the caisson was not built on
land, but under water.
In building the tunnel, the Harlem River was dredged to a certain depth,
so as to leave only 6 ft. or 8 ft. of excavation to be done before
reaching the line of sub-grade of the proposed structure. Two service
platforms were built on piles 10 ft. apart longitudinally, and cut off
at a point above mean high-water mark, braced in the usual manner, and
covered with heavy planks, to serve as the floor of the platform. On
this platform were placed rails for the trains used in the
transportation of materials. These platforms were also used in
maintaining the perfect alignment of the caissons.
Within the platforms and along the dredged channel four longitudinal
rows of piles were sunk. These piles were accurately brought to line by
beams bolted together, and placed across and above the water-level. A
few beams were also added for the purpose of bracing the piles
transversely, after which they were cut off under water and capped.
[Illustration: FIG. 142.--Showing Working Platforms and Piles Sunk in
the Dredged Channel.]
Fig. 142 shows the manner in which the working platforms were
constructed, and also the rows of piles sunk in the dredged channel.
Between the piles a very strong frame was placed, made up of waling
pieces and two transverse beams 14 ins. by 14 ins. each, placed one
below the other at a distance of 5 ft. 8 ins., and strongly braced
together. Guiding-beams were fixed on each side of the frame for the
sheeting piles. The frames were built in sections of different lengths,
and placed directly above the cap-pieces of the pile-bents sunk in the
dredged channel.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account