The regular trains arrived so frequently at the tunnel that slightly
over two hours was the longest working-time between any two trains, and
usually less than one hour at a time was all that it could be worked. In
addition to the regular trains, a large number of extra trains, moving
troops, had to be accommodated. Work was in progress eight months, and
during that time there was no delay to a passenger train. The repairs
were completed in August, 1899. The work was under the direction of Mr.
W. H. Whorley, engineer of the Western & Atlantic R. R., and foreman of
construction, A. H. Richards. A recent examination failed to reveal any
sign of settlement cracks at the junction points of the new and old
work.
CHAPTER XXIII.
RELINING TIMBER-LINED TUNNELS WITH MASONRY.
The original construction of many American railway tunnels with a timber
lining to reduce the cost and hasten the work has made it necessary to
reline them, as time has passed, with some more permanent material. In
most cases the work of removing the old lining and replacing it with the
new masonry has had to be done without interfering with the running of
trains, and a number of ingenious methods have been developed by
engineers for accomplishing this task. Three of these methods which have
been employed, respectively, in relining the Boulder tunnel on the
Montana Central Ry., in Montana, the Mullan tunnel on the Northern
Pacific Ry., in Montana, and the Little Tom tunnel on the Norfolk &
Western R. R., in Virginia, have been selected as fairly representative
of this class of tunnel work.
=Boulder Tunnel.=--This tunnel penetrates a spur of the main range of
the Rocky Mountains, at an elevation at the summit of grade of 5,454
ft., and is 6,112 ft. in length. Its alignment is a tangent, with the
exception of 150 ft. of 30′ curve at the north end. The material
penetrated is blue trap-rock with seams for 4,950 ft. from the north
end, and syenitic boulders with the intervening spaces filled with
disintegrated material for the remaining 1,160 ft. The dimensions and
character of the old timber lining and of the new masonry lining
replacing it are shown in Figs. 159 and 160.
The form of masonry adopted consisted of coarse rubble side walls of
granite, 13 ft. 8 ins. high, and generally 20 ins. thick, with a full
center circular arch of four rings of brick laid in rowlock form. When
greater strength was needed the thickness of the side walls was
increased to 30 ins. and that of the arch to six rings of brick.
[Illustration: ~Cross Section.~
~Longitudinal Section.~
~Cross Section.~
~Cross Section.~
FIGS. 159 and 160.--Relining Timber-Lined Tunnel.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account