The first plan adopted in putting in the masonry was to remove all the
timbering; but owing to the large number of falls and slides this was
abandoned, and the plan followed was to leave in the three roof segments
of the timbering with the overlying cord-wood packing and débris. In
carrying on the work the first step was to remove the side timbers. This
was done by supporting the roof timbers, as shown in Fig. 159; that is,
the first and fourth arch rib of an 8-ft. section containing four arch
ribs were supported by temporary posts. The intermediate arch ribs were
supported against the downward pressure by 6 × 6 in. timbers, extending
from the side ribs near the tops of the temporary posts to the opposite
sides of the intermediate roof segments, as shown in the longitudinal
section, Fig. 160. To resist the pressure from the sides, 4 × 6 in.
braces were placed across the tunnel from near the center of the
intermediate segments to the upper ends of the hip segments, as shown in
the cross-section, Fig. 159. The hip segments were then sawed off below
the notch, and the side timbering removed and the masonry built.
The stone was conveyed into the tunnel on flat cars, and laid by means
of small derricks located on the cars. Two derricks were used, one for
each side wall, and the work on both walls was carried on
simultaneously.
The arch was built upon a centering, the ribs of which were 5¹⁄₂ ins.
less in diameter than the distance between the side walls, so as to
permit the use of 2³⁄₄ ins. lagging. Each center had three ribs, made in
1-in. or 2-in. board segments, 10 ins. thick and 14 ins. deep. These
ribs were mounted on frames, which followed the opposite walls, and were
4 ft. apart, making the total length of the center out to out about 9
ft. The frames, upon which the ribs were supported, are shown in Fig.
161. As will be seen, they were mounted on dollys to enable the center
to be moved from one section to another. Jacks were used to raise and
lower the center into its proper position.
[Illustration: ~Cross Section.~
~Longitudinal Section.~
FIG. 161.--Relining Timber-Lined Tunnel, Great Northern Ry.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account