The general method of directing the excavation in enlarging the profile
by referring all points of the profile to the vertical axis is the one
usually employed in tunneling, and gives good results. It is considered
better in actual practice to have the excavation exceed the profile
somewhat than to have it fall short of it, since the voids can be more
easily filled in with riprap than the encroaching rock can be excavated
during the building of the masonry. In tunnels where strutting is
necessary the excavation must be made enough larger than the finished
section to provide the space for it. In soft-ground tunnels it is also
usual to enlarge the excavation to allow for the probable slight sinking
of the masonry. The proper allowance for strutting is usually left to
the judgment of the foreman of excavation, but the allowance for
settlement must be fixed by the engineer.
SHAFTS.
Shafts are vertical walls or passages sunk along the line of the tunnel
at one or more points between the entrances, to permit the tunnel
excavation to be attacked at several different points at once, thus
greatly reducing the time required for excavation. Shafts may be located
directly over the center of the tunnel or to one side of it, and, while
usually vertical, are sometimes inclined. During the construction of the
tunnel the shafts serve the same purpose as the entrances; hence they
must afford a passageway for the excavated materials, which have to be
hoisted out, and also for the construction tools and materials which
have to be lowered down them. They must also afford a passageway for
workmen, draft animals, and for pipes for ventilation, water, compressed
air, etc. The character of this traffic indicates the dimensions
required, but these depend also upon the method of hoisting employed.
Thus, when a windlass or horse gin is used, and the materials are
hoisted in buckets of small dimensions, the dimensions of the shaft may
also be small; but when steam elevators are employed, and the material
is carried on cars run on to the platform of the elevator, large
dimensions must be given to the shaft. Generally the parts of the shaft
used for different purposes are separated by partitions. The elevator
for workmen and the various pipes are placed in one compartment, while
the elevator for hoisting the excavated material and lowering
construction material is placed in another.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account