=Enlargement of the Profile.=--The enlargement of the profile is
accomplished by excavating in succession several small prisms parallel
to the heading, and its full length, which are so located that as each
one is taken out the cross-section of the original heading is enlarged.
The number, location, and sequence of these prisms vary in different
methods of excavation, and are explained in succeeding chapters where
these methods are described. To direct the excavation so as to keep it
always within the boundaries of the adopted profile, the engineer first
marks the center line on the roof of the heading by wooden or metal
pegs, or by some other suitable means by which a plumb line may be
suspended. He next draws to a large scale a profile of the proposed
section; and beginning at the top of the vertical axis he draws
horizontal lines at regular intervals, as shown by Fig. 15, until they
intersect the boundary lines of the profile, and designates on each of
these lines the distance between the vertical axis and the point where
it intersects the profile. It is evident that if the foreman of
excavation divides his plumb line in a manner corresponding to the
engineer’s drawing, and then measures horizontally and at right angles
to the vertical center plane of the tunnel the distance designated on
the horizontal lines of the drawing, he will have located points on the
profile of the section, or in other words have established the limits of
excavation.
[Illustration: FIG. 16.--Polar Protractor for Determining Profile of
Excavated Cross-Section.]
In the excavation of the Croton Aqueduct for the water supply of New
York city, an instrument called a polar protractor was used for
determining the location of the sectional profile. It was invented by
Mr. Alfred Craven, division engineer of the work. This instrument
consists of a circular disk graduated to degrees, and mounted on a
tripod in such a manner that it may be leveled up, and also have a
vertical motion and a motion about the vertical axis. The construction
is shown clearly by Fig. 16. In use the device is mounted with its
center at the axis of the tunnel. A light wooden measuring-rod tapering
to a point, shod with brass and graduated to feet and hundredths of a
foot, lies upon the wooden arm or rest, which revolves upon the face of
the disk, and slides out to a contact with the surface of the
excavation at such points as are to be determined. If the only
information desired is whether or not the excavation is sufficient or
beyond the established lines, the rod is set to the proper radius, and
if it swings clear the fact is determined. If a true copy of the actual
cross-section is desired, the rod is brought into contact with the
significant points in the cross-section, and the angles and distances
are recorded.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account