Operation AMAZON, published by I Corps on 12 June, ordered that
bridging preparations be made for the approaching summer flood season.
The previous August at the Honker Bridge, the one nearest the railhead,
the Imjin had crested some 27 feet above normal. One reason for the
precautionary efforts taken to insure bridge security during the
flood season was the potential damage the Chinese could cause. Since
they controlled the upriver area of the Imjin, before it entered the
division sector, they could introduce floatable debris or explosives
into the swift running flood waters. Another major concern was the
logistical problem that would be faced by forward MLR units in event
the bridges became impassable and the enormous strain that would thus
be placed on helicopter resupply operations.
The I Corps directive specified that its divisions maintain a transport
capability that would enable medium tanks to pass safely over bridges
spanning the major rivers in their I Corps sector. The order also
called for the removal of debris that could cause damage to bridges.
Removal of those bridges vulnerable to flood conditions and the
erection of emergency river spans were also to take place on corps
order.
To carry out the I Corps operational order, General Seiden put the
division’s own AMAZON plan into effect on 1 July. On this date
Companies A, B, and D of Lieutenant Colonel Harry D. Clarke’s 1st
Engineer Battalion began extensive preparations for debris removal from
the four bridge sites in the division sector. Even before this, Marine
engineers and shore party personnel had been trained at special schools
to handle U.S. Army equipment provided for the AMAZON operation.[156]
[156] This included employment of the 60-inch searchlight
for night illumination, maintenance of boats for
debris removal, and operation of the M-4 ferry. Other
preparations by the division, of a non-engineer nature,
included positioning of 13,000 life-saving floatation
devices for use by frontline troops should they become
shut off from planned evacuation.
Beginning 1 June, division engineers began blasting away at objects
that flood waters could loosen and carry into the bridge supports.
Bridge approaches were improved and their supports strengthened.
Each company had a detail living at the bridge site for which it was
responsible. With the advent of heavy rains, these Marines were to
operate 24-hour boat patrols to keep the river free of debris. The
engineers were also to maintain a round-the-clock debris watch at the
four division bridges--Freedom Gate, or the Munsan-ni Railroad Bridge
in the left regimental sector; Honker and X-Ray in the center; and
finally, Widgeon, very close to the Commonwealth boundary.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account