U.S. Marine Operations in Korea, 1950-1953, Volume 5 (of 5): Operations in West KoreaUnited States. Marine Corps
History
U.S. Marine Operations in Korea, 1950-1953, Volume 5 (of 5): Operations in West Korea
United States. Marine Corps
Korean War, 1950-1953 -- Campaigns; United States. Marine Corps -- History -- Korean War, 1950-1953
Heavy rains began on 27 July and continued until the 30th. On the first
day the decking of Widgeon Bridge was completely submerged and Honker
was removed to prevent its being carried away. Precipitation increased
on 28 July and reached its peak on 29 July when 3.66 inches of rainfall
were recorded. By the 30th, the rains had subsided but not before the
overflowing Imjin had collapsed the X-Ray bridge. During the height of
the four flood days, engineers fought the rains, flooding waters, and
floating debris. The major effort took place downstream to save the
Freedom Gate Bridge.
Assigned personnel removed debris from the bridge supports, guided
large, dangerous pieces away with poles, while upriver the boat teams
blasted still larger sections into manageable chunks that would pass
between the bridge supports. These engineer efforts, in addition to
regular repair and maintenance of the large road net, constituted the
major ground activity in the 1st Marine Division sector in late July.
August would bring more rains and emergency demands on the engineers,
but the critical ground activity at that time would be directed against
the Communists in the area around Bunker Hill.
CHAPTER III
The Battle of Bunker Hill
_The Participants and the Battlefield--Preliminary Action on
Siberia--The Attack on Bunker Hill--Consolidating the Defense of Bunker
Hill--Company B Returns to Bunker Hill--Supporting Arms at Bunker
Hill--In Retrospect_
_The Participants and the Battlefield_[157]
[157] Unless otherwise noted, the material in this section is
derived from: _PacFlt EvalRpt_ No. 5, Chap. 8; 1stMarDiv
ComdDs, Jul-Aug 52; 1stMar, 2/1, 3/1 ComdDs, Aug 52; 1st
MAW ComdD, Aug 52.
The torrential rains that had fallen just before the end of July
continued to affect ground operations into early August. Contacts
between opposing forces were few and brief, and casualties remained
correspondingly low. On 1 August, General Selden assigned the reserve
regiment, the 7th Marines, the task of developing the secondary defense
line, KANSAS, at the extreme right of the division sector. The 5th
Marines, manning this regimental area and originally responsible for
the construction, had been unable to reach the second line because
bridging across the Imjin to the rear of the sector was washed out. By
3 July the division put a ferry service into operation at the site of
the inoperable Honker Bridge for the purpose of feeding ammunition to
combat units north of the Imjin. The critical resupply problem began
to ease the next day when the waters overflowing the Widgeon Bridge
further upstream receded sufficiently to permit restoration of normal
vehicular crossings there.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account