Waterways and Water Transport in Different Countries: With a description of the Panama, Suez, Manchester, Nicaraguan, and other canals.Jeans, J. Stephen (James Stephen)
History
Waterways and Water Transport in Different Countries: With a description of the Panama, Suez, Manchester, Nicaraguan, and other canals.
Jeans, J. Stephen (James Stephen)
Canals
_The Locks of Nussdorf._—To prevent winter accumulations of ice from
entering the new canal, and to divert floods, locks were constructed
at Nussdorf, which are indicated in the drawings herewith. The side
walls are founded on cylinders sunk down to the gravel to a depth of 31
feet below zero, and the tops of the abutment of the lock are 15 feet 6
inches above the same level. The distance between the side walls is 155
feet 10 inches. The entrance to the lock is closed by a caisson, the
lock being closed only in winter. The invert of the lock is of béton,
set in Portland cement, 4 feet 1½ inch thick, the foundation being of
piles, as shown on the plan. The level of this invert is 12 feet 9
inches below zero; below that part of the invert, at the entrance to
the lock, the floor is made of heavy stonework laid at the same level.
The foundations of the barrage at Nussdorf consist of iron caissons,
that on the right bank being rectangular in form, and 81 feet long by
18 feet 7 inches wide, while the wall on the left bank is 99 feet long,
by the same width as the other, with an enlargement on the side towards
the canal for the lock gates.
Joining the old bed of the Danube at the Bridge of Stadlau, and
following its course as far as the island of Wiedenhaufen, through
which it passes, the channel line enters the river again opposite the
village of Albern. On the left side of the river a protecting dyke
was erected in order to guard against flooding the great plains of
Marchfeld.
The new channel is 933 feet wide, 8·3 to 11·4 feet in depth, and has a
mean slope of 1 in 2272, the speed of the current varying according to
the state of the river. The side slope has an inclination of 2 to 1,
and is riveted throughout in stone 9¾ inch thick, with a banquette on
the top 39 inches wide. The ground on the right bank has been raised so
as to reach the same height as the dyke on the left, thus protecting
the country round about from inundation.
The above works cost over two millions sterling. The quay walls, locks,
and other operations were described in a monograph published in 1878
by M. Hersent, one of the contractors, and reprinted in _Engineering_,
from which the foregoing particulars have been mainly reproduced.
The total amount of earthwork was 23,575,928 cubic yards, divided as
follows:—
Excavators 4,775,334
Dredgers 9,491,254
Barrows 9,309,340
RÉSUMÉ OF WORKS EXECUTED FOR THE DANUBE REGULATIONS.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account