It is commonly believed that surveyors when laying out railways
and canals, are obliged to allow 8 inches per mile for the Earth’s
curvature; and that if this were not done in the latter case the water
would not be stationary, but would flow on until at the end of one
mile in each direction, although the canal should have the same depth
throughout, the surface would stand 8 inches higher in the middle than
at the ends. In other words, that the bottom of a canal in which the
allowance of 8 inches per mile had not been made, would be a chord
to the surface of the contained water, which would be an arc of a
circle. To this it is replied, that both in regard to railways and
canals, wherever an allowance has been attempted the work has not
been satisfactory; and so irregular were the results in the earlier
days of railway, canal, and other surveying, that, the most eminent
engineers abandoned the practice of the old “forward levelling” and
allowing for convexity; and adopted what is now called the “double
sight” or “back-and-fore sight” method. It was considered that whether
the surface were convex or horizontal, or whether the convexity were
more or less than the supposed degree, would be of no consequence in
practice if the spirit level or theodolite were employed to read both
backwards and forwards; for whatever degree of convexity existed,
one “sight” would compensate for the other; and if the surface were
horizontal, the same mode of levelling would apply. So important did
the ordnance department of the Government consider this matter, that it
was deemed necessary to make the abandonment of all ideas of rotundity
compulsory, and in a standing order (No. 6) of the House of Lords as to
the preparation of sections for railways, &c., the following language
is used, “That the section be drawn to the same _horizontal_ scale as
the plan; and to a vertical scale of not less than one inch to every
one hundred feet; and shall show the surface of the ground marked on
the plan, the intended level of the proposed work, the height of every
embankment, and the depth of every cutting; and a _datum_ HORIZONTAL
LINE, which shall be _the same throughout the whole length of the
work_, or any branch thereof respectively; and shall be referred to
some fixed point stated in writing on the section, near some portion of
such work; and in the case of a canal, cut, navigation, turnpike, or
other carriage road, or railway, near either of the termini.” No. 44
of the standing orders of the House of Commons is similar to the above
order (No. 6) of the House of Lords.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account