Not far from where I lived in the mountains when a boy, the beaver
built a dam. This had a slight arch upstream. A few years later the
dam was doubled in length by building an extension on the end which
bowed downstream. It thus stood a reverse curve. Later the dam was
still further lengthened by a comparatively straight stretch on one
end, and by a short, down-bowing stretch on the other. Recent
additions to this dam consist of wings at the end which sweep
upstream. The dam as it now stands reaches about three fourths of the
way around the pond which it forms.
It is not uncommon for a dam to be planned and built with an arch
against the current or against the water which it afterwards impounds.
The most interesting dam of this kind that I ever saw was one across
the narrow neck of a rudely bell-shaped basin that was about two
hundred feet in length. The material for this dam came from a grove of
aspens that extended into one side of the basin. The floor of this
basin was partly covered with a few inches of water. In starting the
dam the beaver evidently knew where they wanted to build it. This was
not by the aspen grove where the materials were convenient, where the
dam would need to be about one hundred and twenty feet long, but was
about fifty feet farther on, where a dam of only forty feet was
required. This dam when completed bowed seven feet against the
enclosed water. The beaver commenced building at the end nearest the
grove of aspens, pulling and dragging the poles the fifty feet to it.
They laid these aspen poles, which were two to five inches in diameter
and from four to twelve feet in length, at right angles to the length
of the dam, and usually placed the large end upstream or against the
current. But the water was shallow, and the transportation of these
poles to the dam was difficult. Accordingly a ditch or canal was dug
from the grove to the place by the dam where the work was going on.
This ditch was about twenty-five inches wide and fifteen deep. The
waters filled it and thereby afforded an easy means of floating or
transporting the poles from the grove to the place where they were
being used. This ditch was carried forward along the upper line of the
dam, and several feet in advance of the spot where the outbuilding
work was advancing. Upon the earth thrown up from this were laid the
upper or high ends of the poles. When the dam was finally completed,
it was approximately eight feet wide on the base and stood four feet
high. As soon as it was completed, the beaver stuffed the water-front
with mud and grass roots, which were obtained by digging from the
construction ditch immediately in front of the dam. In other words,
they enlarged their pole-floating ditch above the dam into a deeper
and wider channel, and used this excavated material for strengthening
and waterproofing the dam.