A large harvest of aspen and willow was gathered for winter. Daily
visits to the scene of the harvest enabled me to understand many of
the methods and much of the work that otherwise would have gone on
unknown to me. Early in the harvest an aspen cluster far downstream
was cut. Every tree in this cluster and every near-by aspen was
felled, dragged to the brook, and in this, with wrestling, pushing,
and pulling, taken upstream through shallow water,--for most mountain
streams are low during the autumn. In the midst of this work the
entrance or inlet of the canal was blocked and the bow dam was cut.
The water in the brook was almost doubled in volume by the closing
of the canal, thereby making the transportation of aspens upstream
less laborious.
[Illustration: THE DEAD-WOOD DAM, LOOKING SOUTH]
When the downstream aspens at last reposed in a pile beside the house,
harvesting was briskly begun in the aspens along the shore of the new
pond. Then came another surprise. The bow dam was repaired, and the
canal not only opened, but enlarged so that almost all the water in
the brook was diverted into the canal, through which it flowed into
the new pond.
The aspens cut on the shore of the new pond were floated across it,
then dragged up the canal into the old pond. Evidently the beavers not
only had again turned the water into the canal that they might use it
in transportation, but also had increased the original volume of water
simply to make this transportation of the aspens as easy as possible.
Their new works enabled the colonists to procure nearly five hundred
aspens for the winter. All these were taken up the new canal, dragged
over the bow and the main dams, and piled in the water by the house.
In addition to these, the aspens brought from downstream made the
total of the harvest seven hundred and thirty-two trees; and with
these went several hundred small willows. Altogether these made a
large green brush-pile that measured more than a hundred feet in
circumference, and after it settled averaged four feet in depth. This
was the food-supply for the oncoming winter. The upper surface of this
stood about one foot above the surface of the water.
Five years after the completion of this dead-wood dam it was so
overgrown with willows and grass that the original material--the dead
tree-trunks that formed the major portion of it--was completely
covered over. The new pond was used but one season. All the aspens
that were made available by the dam of the pond were cut in one
harvest. The place is now abandoned, old ponds and new.
The Ruined Colony