In other tunnels the complete section has been excavated and timbered,
and the work of building commenced from the foundation of the side
walls. A strong continuous invert from side wall to side wall is
necessary where passing through soft swelling clay or loose strata
intersected with small streams of water. Where the material is very
solid and dry, it is not necessary to introduce inverts, but the
foundations of the side walls should be laid at such a depth below
rail-level as not to be affected by drain-water running through the
tunnel.
The side walls and arching may be either of masonry or brickwork, but
should be of the best description, especially for the facework. For
brick arching only the best hard-burnt bricks should be used, and the
inner or exposed ring should consist of selected hard fire-bricks to
withstand the heat and gases escaping from the funnels of the
locomotives. The thickness of the side walls and arching will depend
upon the description of material to be supported. In some places a
comparative thin lining may be sufficient, while in others extra
thickness must be given to resist the great pressure exerted by
expanding clay and loose wet strata.
Weeping-holes, or small drain-pipes, placed low down must be left in
the side walls every three or four yards, or closer in very wet
places, to allow the water collected at the back of the walls to
escape into the side drains of tunnel. In building the arch portion
every effort should be made to have close solid work without any open
joints or spaces through which the water may run, and the crown of the
arch and a few feet down on each side should be coated with cement or
asphalte to lead all water away from the top to the sides. Water
dripping from the under side of the arch on to the line is a great
destructor of the permanent way materials, especially the fastenings;
and bolts, nuts, fish-plates, and spikes placed in a wet dripping
tunnel will not last half the time they would out in the open line,
where they would have the sun and wind to dry them.
[Illustration: Fig. 212, 213, 214, 215, 216, 217, 218, 219]
Small arched recesses or niches should be formed in the side walls at 176
convenient distances to serve as refuges for platelayers or others
working in the tunnels.
It is most essential that the space between the masonry and brickwork
lining and the facework of the excavation should be carefully filled
in and hard packed, so as to prevent the possibility of pieces of rock
or other material falling on to the top of the arch. The neglect of
this precaution may lead to a casualty years after the tunnel has been
completed.