Railway Construction — John Stuart Mill — John Shaqi
Railway Construction
John Stuart Mill · en
The construction and maintenance of a railway calls for the
application of so many branches of engineering that several volumes
would be required to do ample justice to a subject so comprehensive
and ever-extending. To avoid attempting so wide a range, the object of
the following pages has been to describe briefly some of the
recognized leading features which regulate railway construction, and
to assist the explanation with sketches of works selected from actual
practice.
Where the number of existing good examples is legion, it is somewhat
difficult to make a choice for illustration, and the course adopted
has been to select such samples of structures as appear best to
elucidate in a simple manner the different types of work under
consideration.
In the drawings and diagrams many important minor details are
necessarily omitted, partly to avoid complexity, but principally to
leave more prominent the leading features of the particular piece of
work referred to in the description. Some of the sketches of the large
span bridges and large span roofs are only shown in outline; but, as
their principal dimensions are given, a general idea can be obtained
of their actual proportions.
No allusion is made to the requisite strengths of the various
structures described, nor to the necessary dimensions of the materials
used in their construction, as this would necessitate the introduction
of a vast amount of mathematical formulæ which does not come under the
province of the object in view, and which the engineer has already at
command from his training and works of reference.
Neither is any mention made as to the probable cost of the different
works of construction, as these must always vary to a very large
extent, according to the locality, facility of supply, and current
prices of materials.
Every railway scheme which is the outcome of public enterprise has its
commercial aspect and influence. The large sums to be invested in its
construction are expected to yield permanent and increasing returns,
and this desirable end can only be attained where there is thorough
efficiency in works and equipment, and a full compliance with those
national regulations which control matters connected with public
safety. The correct dealing with the technical requirements and
structural features of the undertaking must always precede all other
considerations, as the constituted authorities will exact a proper
fulfilment of all the statutory obligations, regardless of the
prospective remuneration to the promoters. A stroke of the pen may
change a train-service, or alter the rates and tariffs, but a
modification in the works of construction arising out of errors or
oversight, would entail a heavy expenditure and tedious delay. The
essential point of every railway undertaking must be its suitability
and completeness in every respect for the duty for which it is
intended.