” 75 | -- | 43 | 94 | 164 | -- | 95 | 163 | 240
” 70 | -- | 39 | 86 | 152 | -- | 88 | 153 | 226
” 60 | -- | 28 | 70 | 128 | -- | 74 | 131 | 196
” 50 | -- | -- | 53 | 101 | -- | -- | 107 | 163
” 40 | -- | -- | -- | 73 | -- | -- | -- | 127
” 25 | -- | -- | -- | 27 | -- | -- | -- | 67
-----------------------+-----+-----+------+------+-----+-----+------+------
NOTE.--The column loads in tons are exclusive of the weight of
engine and tender.
From the above memoranda it will be seen how greatly the gradients 45
affect the loads. For an important main trunk line, with a heavy and
frequent train-service of passengers and goods, the introduction of
steep gradients would not only reduce the speed of the train-working,
but would probably involve the necessity of assistant engines over
those parts of the line; and it may be prudent, where possible, to
incur heavier earthworks, or considerable detours, or tunnels, to
obtain more favourable gradients. For such a line the additional cost,
and the extra distance caused by a detour of a mile or more, will be
of far less importance than the interruption in the train service
arising from a serious reduction in speed or taking on assistant
engines. On many railways abroad there are very interesting examples
of long detours of several miles, carefully studied out to obtain
greater length and easier gradients, resulting in the construction of
lines over which the traffic can be worked without necessitating
auxiliary engine-power. On the other hand, there are situations where
steep gradients cannot be avoided, where certain altitudes must be
reached, and where there is no alternative but to face the inevitable.
On secondary lines, and short branch lines, where the traffic is not
expected to be heavy, and where speed is not so important, it may be
policy to economize outlay and introduce steeper
gradients than on the main line.
Half a mile of a rather steep gradient is not felt so much when it is
situate midway between two stations, because the attained speed of the
train assists the engine over the short distance to the summit; but
when it occurs as a rising gradient out of a station, it forms a great
check to the working, particularly in bad or wet weather, when there
is the risk of the engine slipping, and the entire train sliding back
into the station.