Works of construction: Earthworks, Culverts, Bridges, Foundations,
Screw piles, Cylinders, Caissons, Retaining walls, and Tunnels.
Earthworks.--Under this heading may be classified cuttings and
embankments of earth, clay, gravel, and rock.
When setting out a line and adjusting the gradients, an endeavour is
usually made to so balance the earthworks that the amount obtained
from the cuttings may be sufficient to form the embankments. With
care, this may be effected to a considerable extent; but there will be
places where the material from cutting is unavoidably in excess, and
others where the cuttings are too small, or contain good rock, or
gravel, which can be more advantageously used for building and
ballasting purposes than for ordinary embankment filling. Or there may
be a large cutting which will provide enough material to form three or
four of the adjoining embankments; but the distance, or _lead_, as it
is termed, to the far embankment may be so long, and, perhaps, on a
rising gradient, that it would be cheaper to run the surplus cutting
to _spoil_, and _borrow_ other material for the far embankment from
side cutting or elsewhere. A long lead adds materially to the cost and
time of forming an embankment, as it not only necessitates a
considerable length of _service_, or temporary permanent way, but also
occupies much time in the haulage of the earth waggons. For distances
of half a mile and upwards, a small locomotive is more suitable than
horses for conveying the waggons.
To run to _spoil_ is the term applied to such of the material from a
cutting which, not being required or utilized in the formation of the
line embankments, is removed and tipped into mounds, or
_spoil-banks_, in some one or more convenient sites near the mouth of
the cutting. Sometimes the surplus material is disposed of by
increasing the width of the embankments. Material excavated in a 61
tunnel, and hoisted through the shafts to the upper surface, has to be
deposited in spoil-banks along the centre line of the tunnel.
To _borrow_ material to form an embankment is the term used when the
earthwork filling is not obtained from the cuttings
on the line. This borrowing is generally done by excavating
a trench on each side of the line, of such width and depth as
will supply sufficient material to form the embankment. Fig.
47 gives an example of an embankment thus made from side
cutting. In some cases a piece of high ground adjacent to the
embankment can be utilized for obtaining a portion, or even
the whole of the filling.
Increased material is sometimes obtained by widening the
cutting, or flattening the slopes, or both.