Large, open plains and wide valleys of important rivers generally
afford ample latitude for the selection of a suitable route, and, by
taking advantage of the gradations of altitude, a favourable course
may be adopted without incurring excessive gradients. When traversing
moderately hilly districts, some low ridge or opening may be found,
which may form a pass from the one side to the other, and the line may
be laid out for a long distance to lead gradually up to the highest
point. But when a route has to be laid out over some of those lofty
mountain ranges which are met with abroad, the locating of a suitable
line, or of any line, becomes particularly intricate and difficult. A
comparatively low ridge may be found possessing features in favour of
the project, but the question will be how to reach that point. The
nearer the summit of these high mountains, the more precipitous the
sides; no one slope can be found sufficiently long and uniform to 3
permit a practical direct ascent, and the only way out of the
difficulty is to make a series of detours along the various spurs of
the mountains to gain length to overcome the height. Each detour has
to be the subject of most careful study. Forming part of a long series
of ascending gradients, it has to follow the winding of the
mountain-side, must be laid out to be always gaining in height, and
will comprise important works, many of them of considerable extent,
necessary for protection against the floods and atmospherical changes
of the locality.
In these higher altitudes nature is met with on the grandest and most
rugged scale. Deep gorges, wide ravines, and almost perpendicular
rocks form the pathway along which the line must be carried, and the
skill of the engineer is taxed to the utmost to select a course which
shall comprise a minimum of the works of magnitude. Mile after mile of
line must be laid out in almost inaccessible places, loose or broken
rocks must be avoided, a firm foundation must be obtained at all
points skirting high ledges, and ample provision must be made for
those mountain torrents which rise so suddenly, and are liable to
sweep away all before them.
Many grand examples of these detour lines are in existence in
different parts of the world, and the traveller passing over them can
realize the difficulties that had to be encountered, and the masterly