Railway Construction — John Stuart Mill — John Shaqi
Railway Construction
John Stuart Mill · en
With the syphon arrangement the iron pipes must be laid down the
slopes of the cutting and under the road-bed of the permanent way. The
pipes must be continuous, strong, and firmly connected at the joints
to prevent leakage. The inlet and outlet ends of the pipes should be
securely built into receiving-tanks of masonry, brickwork, or
concrete, to ensure an uninterrupted flow of the stream, and also to
prevent any of the water from percolating through under the pipes and
on to the railway. As a precautionary measure, it is well to place
iron gratings some little distance in advance of the syphon pipes to
intercept and collect any brushwood, straw, or other things which
might be brought down with the stream.
Fig. 73 gives an example of the syphon arrangement as constructed with
two cast-iron pipes placed side by side.
Railway works carried out in cities and large towns, whether they take
the form of cuttings, embankments, arching, or tunnels, are certain to
cause a very considerable disturbance of existing drains, corporation
sewers, gas-pipes, water-mains and underground telegraph wires. Some
of these underground works may be so peculiar and complicated as to
necessitate a slight deviation from the course originally intended for
the line. Suitable provision will have to be made for each of the
items interfered with by the railway, and the substituted work must be
carried out to the satisfaction of the constituted authorities within
the municipal boundaries.
[Illustration: Fig. 72, 73]
Bridges.--Amongst the many bridges and viaducts which have to be
built during the making of a railway those constructed over rivers and
waterways are generally the most important The bridging across any 81
navigable river or tidal water can only be effected in compliance with
conditions imposed by the authorities controlling the navigation
rights. These conditions will place restrictions as to the number and
distance apart of the piers, as well as the height from high water
level to the under side of the arches or girders. For rivers having a
constant traffic of sea-going vessels of large tonnage and lofty masts
the authorities will demand great height or headway as well as large
spans; and if to this be added a deep water-way and bad foundations,
the work to be constructed becomes one of considerable magnitude. The
banks of the river must be carefully studied to find the most
favourable point for crossing, and in some cases it may be prudent to
make a detour of two or three miles. The crossing at a great height
involves the construction of the approach lines at a great height
also. If the river is in a deep valley with high sloping sides the
natural contour of the ground facilitates the formation of the
approach lines; but with a river on a low, wide, open plain, inclined
approach lines add enormously to the cost of construction, as well as
to the cost of permanent working.