The roast-reaction process of smelting, as practised at Tarnowitz,
was characterized by a comparatively large charge, slow roasting and
low temperature, differing in these respects from the Carinthian and
Welsh processes. It was not aimed to extract the maximum proportion of
lead in the reverberatory furnace itself, the residue therefrom, which
inevitably is high in lead, being subsequently smelted in the blast
furnace. Ores too low in lead to be suitable for the reverberatory
smelting were sintered in ordinary furnaces and smelted in the blast
furnace together with the residue from the other process. In both of
these processes the loss of lead was comparatively high. One of the
most obvious advantages of the Huntington-Heberlein process is its
ability to reduce the loss of lead. The result in that respect at
Tarnowitz is clearly stated by Mr. Biernbaum, whose paper will surely
attract a good deal of attention.[8]
LEAD SMELTING IN REVERBERATORY FURNACES AT DESLOGE, MO.
BY WALTER RENTON INGALLS
(December 16, 1905)
The roast-reaction method of lead smelting in reverberatory furnaces
never found any general employment in the United States, although
in connection with the rude air-furnaces it was early introduced in
Missouri. The more elaborate Flintshire furnaces were tried at Granby,
in the Joplin district, but they were displaced there by Scotch
hearths. The most extensive installation of furnaces of the Flintshire
type was made at Desloge, in the Flat River district of southeastern
Missouri. This continued in full operation until 1903, when the major
portion of the plant was closed, it being found more economical to ship
the ore elsewhere for smelting. However, two furnaces have been kept
in use to work up surplus ore. As a matter of historic interest, it is
worth while to record the technical results at Desloge, which have not
previously been described in metallurgical literature.
The Desloge plant, which was situated close to the dressing works
connected with the mine, and was designed for the smelting of its
concentrate, comprised five furnaces. The furnaces were of various
constructions. The oldest of them was of the Flintshire type, and
had a hearth 10 ft. wide and 14 ft. long. The other furnaces were a
combination of the Flintshire and Tarnowitz types. They were built
originally like the newer furnaces at Tarnowitz, Upper Silesia, with a
rather large rectangular hearth and a lead sump placed at one side of
the hearth near the throat end; but good results were not obtained from
that construction, wherefore the furnaces were rearranged with the sump
at one side, but in the middle of the furnace, as in the Flintshire
form. The rectangular shape of the Tarnowitz hearth was, however,
retained. Furnaces thus modified had hearths 11 ft. wide and 16 ft.
long, except one which had a hearth 13 ft. wide.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account