The Government steamers are in a very bad state of repair, and much time
is lost owing to breakdowns. In the rainy season branch steamers travel
between the coast and Baro, at present carrying railway material. They
have facilities for handling heavy cargo.
The season extends from July to September.
The Government and Niger Company’s boats have no facilities for handling
heavy cargo, being limited to packages capable of being handled by native
labour, which is tedious and expensive.
The cost of transport by Government steamers for ordinary cargo from
Forcados to Baro is from 40s. to 60s., and down from Baro to Forcados is
from 21s. to 33s.
_Railway Transport._—Baro to Rigachiko.
The distance is 225 miles. The railway is not yet completed to Rigachiko,
where the Bauchi road starts, but I understand from railway officials
that the line will be through by next March, 1911. Railhead at present is
at Kogin Serikin Pawa, 172 miles from Baro, but rails are laid to within
fifteen miles of Rigachiko, and this part of the line will be ready as
soon as the bridges are completed.
The railway is 3 feet 6 inch gauge, and has been constructed with economy
always in view. Up to the present there is no ballast on the line, and
consequently there are serious delays during the rainy season owing to
derailment of engines and the washout of embankments. My journey from
Baro to railhead occupied fifteen days; the most of this time was lost
owing to breakdowns on the line.
The journey should occupy two days, and I have no doubt that by March
next it will be possible to get from Baro to Rigachiko in two days.
The freight on the line at present is 8s. per ton per mile, equal to £7
10s. per ton from Baro to Rigachiko, but at present the railway company
will not undertake to transport cargo unless it is accompanied, and even
then they will take no responsibility.
I understand that in the next year, when the railway is open to Zaria,
the freight will be reduced to 6s. per ton per mile, equal to £5 12s. 6d.
per ton from Baro to Rigachiko.
_Road Transport._—Rigachiko to Naraguta.
The distance is approximately 135 miles. On my journey across by this
road I took eight days, which is as quick as can be expected.
The Government engineers are clearing a track twelve feet wide, and
pulling out tree stumps. They are also grading down banks of creeks to
one in ten.
They are expending £20 per mile on this work, and have completed fifty
miles in two months.
This road track will come into the tin fields at Toro, twelve miles
north-east of Naraguta, and twelve miles west of the company’s property
at Federri. This track should be finished by the end of the year.
The country is flat and very easy for road building. There are four large
rivers to cross, which would require bridges of over 100 feet in length,
and numerous small creeks which could be bridged cheaply.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account