For molding hot compounds, a clay dike, or funnel, built about 3 inches
high around the triangular opening at the top of the jointer greatly
aids in the rapid and complete filling of the joint space. A hot joint
must be poured continuously, otherwise a seam may develop between
successive pourings.
Bituminous compounds make a slightly elastic joint. A joint in 4-inch
pipe requires about 3/8 to 1/2 pound of compound and in 6-inch pipe
about 1 to 1-1/2 pounds.
Sulfur-sand joints are hard and inelastic. The compound is made by
mixing together equal volumes of ordinary powdered sulfur and very
fine clean sand, preferably the finest quicksand, and then heating
the mixture until the sulfur melts. A 4-inch joint takes about 3/4
pound and a 6-inch joint about 1-7/8 pounds of the mixture. Commercial
sulfur-joint compounds also are available.
[Illustration: Figure 3.--Jointing sewer pipe. _A_, Using
calking iron to force packing into joint. _B_, Making joint with 1:2
portland cement mortar. Use only enough water to dampen the mix. Recalk
after half an hour, to close shrinkage cracks. _C_, The completed
joint. Wrap finished joint with cloth and keep dampened, to aid
curing. _D_, Joint made by pouring 1:1 Portland cement grout of creamy
consistency into a form. This type of joint is not feasible unless the
metal forms shown are available. _E_, Use of asbestos runner clamped
around pipe, for pouring hot joint. _F_, Clay roll used in place of
asbestos runner. _G_, A completed bituminous joint. _H_, Use of swab,
to remove any joint material forced through to inside of pipe.]
Soft pig lead or old scrap lead is suitable for lead joints on
cast-iron pipe. About 3/4 pound per inch of pipe diameter is generally
required for each joint. The lead is hot enough to pour when it begins
to char the paddle used to skim off the impurities. When it cools it
must be calked tightly to take up shrinkage. The calking should be
uniform around the entire joint and should stop when the lead is tight.
Heavy pounding or continued calking may crack the bell of the pipe.
It is easier to get good, joints when the pipe is in a vertical
position. Therefore, two lengths of pipe are frequently joined and are
then laid as a single unit in the trench. In using terra cotta pipe,
this procedure may be followed only when the joint is made with a
mastic compound. Cement-mortar joints cannot be used in such cases.
Before filling the trench, the sewer should be tested to detect
possible leaks. Earth free from rubbish and large stones should then be
tamped around and about 1 foot above the pipe.
THE SEPTIC TANK
Flow Through the Tank
Slow, undisturbed flow through the tank is necessary for the separation
of solids and liquids and for bacterial action. Submerged inlets
and outlets or baffle boards reduce disturbance. A submerged outlet
prevents scum from passing out with the effluent.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account