“Upon the level bed prepared for the road materials, a bottom course or
layer of stones is to be set by hand in form of a close, firm pavement;
the stones set in the middle of the road are to be seven inches in
depth; at nine feet from the centre five inches; at twelve feet from the
centre four inches; and at fifteen feet three inches. They are to be set
on their broadest edges lengthwise across the road, and the breadth of
the upper edge is not to exceed four inches in any case. All the
irregularities of the upper part of the said pavement are to be broken
off by the hammer, and all the interstices to be filled with stone chips
firmly wedged or packed by hand with a light hammer, so that when the
whole pavement is finished there shall be a convexity of four inches in
the breadth of fifteen feet from the centre.[14]
“The middle eighteen feet of pavement is to be coated with hard stones
to the depth of six inches. Four of these six inches to be first put on
and worked in by carriages and horses; care being taken to rake in the
ruts until the surface becomes firm and consolidated, after which the
remaining two inches are to be put on.
“The whole of this stone is to be broken into pieces, as nearly cubical
as possible, so that the largest piece in its longest dimensions may
pass through a ring of two and a half inches inside diameter.
“The paved spaces on each side of the eighteen middle feet are to be
coated with broken stones or well-cleaned stony gravel up to the foot
path or other boundary of the road, so as to make the whole convexity of
the road six inches from the centre to the sides of it, and the whole of
the materials are to be covered with a binding of an inch and a half of
good gravel free from clay or earth.”
If the above specification, written more than fifty years ago, is
compared with one of the present date, it will be seen that there is a
strong resemblance between them.
_Specification of a Roadway as now executed._
The cross section of the roadway _when finished_ is to be an arc of a
circle, with a rise of 1 in 27 from kerb to the centre of the roadway
each way.[15] The roadway, when consolidated and finished, to be 12
inches in depth at the gutters and 15 inches at the centre, diminishing
gradually from this point right and left to the depth named. The gutters
to be 2 feet in width, formed of stone setts 6 inches by 6 inches, and
laid in sand, on a firmly consolidated surface of small broken stone or
gravel.
The earth road-bed on which the surface formation is to rest is to be
excavated to the required depth, and when graded and shaped to its
proper form, it is to be thoroughly and repeatedly rolled with a steam
roller, and all depressions which then appear are to be filled with the
same material as the road-bed, and rolled until the whole be uniformly
compact and firm.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account