=Excavation of the Heading.=--There is considerable confusion among the
different authorities regarding the exact definition of the term
“heading” as it is used in tunnel work. Some authorities call a small
passage driven at the top of the profile a heading, and a similar
passage driven at the bottom of the profile a drift; others call any
passage driven parallel to the tunnel axis, whether at the top or at the
bottom of the profile, a drift; and still others give the name “heading”
to all such passages. For the sake of distinctness of terminology it
seems preferable to call the passage a heading when it is located at the
top of the profile, and a drift when it is located near the bottom.
Headings and drifts are driven in advance of the general excavation for
the following purposes: (1) To fix correctly the axis of the tunnel; (2)
to allow the work to go on at different points without the gangs of
laborers interfering with each other; (3) to detect the nature of
material to be dealt with and to be ready in any contingency to overcome
any trouble caused by a change in the soil; and (4) to collect the
water. The dimensions of headings in actual practice vary according to
the nature of the soil through which they are driven. As a general rule
they should not be less than 7 ft. in height, so as to allow the men to
work standing, and have room left for the roof strutting. The width
should not be less than 6 ft., to allow two men to work at the front,
and to give room for the material cars without interfering with the wall
strutting. Usually headings are made 8 ft. wide. The length of headings
in practice varies according to circumstances. In very long tunnels
through hard rock the headings are sometimes excavated from 1000 ft. to
2000 ft. in advance, in order that they may meet as soon as possible and
the ranging of the center line be verified, and so that as great an
area of rock as possible may be attacked at the same time in the work of
enlarging the profile. In short tunnels, where the ranging of the center
line is less liable to error, shorter headings are employed, and in soft
soils they are made shorter and shorter as the cohesion of the soil
decreases. When the material has too little cohesion to stand alone, the
tops and sides of the heading require to be supported by strutting. To
prevent caving at the front of the heading, the face of the excavation
is made inclined, the inclination following as near as may be the
natural slope of the material.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account