Some shafts are only intended for the temporary purpose of lifting the
excavations from below, or lowering building materials down, and when 169
the work is completed they are filled in again and closed. These
service shafts are generally made square in section, and are merely
lined with wood. Strong vertical timbers are placed at the four
corners, to which horizontal double cross-pieces are bolted, thick
planking being placed vertically at the back of these cross-pieces to
support the sides of the excavation.
The _heading_ of a tunnel is a narrow passage or gallery cut
through from end to end of the works in the direction of the centre
line. Where there are shafts, the cutting of the heading can be pushed
on from several points, and be completed much more rapidly than when
the working is restricted to the two ends. Headings are usually made
just sufficiently large for the miners to work, say about 5 feet 6
inches high by about 3 feet wide, the object being rather to expedite
the driving of the driftway than to remove large masses of material.
They must be set out with great accuracy, and be constantly checked as
the driving is in progress. When completed from end to end, the centre
line can be checked throughout, and the course actually taken compared
with the course intended. If there has been much variation in the
narrow pioneer pathway, either in line or level, the amount of the
divergence must be rectified when ranging the final centre line for
the full-size excavation.
Tunnels cannot always be delayed until the heading is cut through for
the entire length. In many cases the heading, the full-size
excavation, and the permanent lining have all to be carried on at the
same time, but as the work of the heading is smaller in extent, that
portion of the operations can usually be kept well in advance of the
others. The critical moment arrives when the headings from opposite
directions meet, as any deviation or want of coincidence must be
adjusted in the portion of the tunnel still remaining to be opened out
to full size. Some tunnels of moderate length have been constructed
without any heading at all, the excavation being taken out to the full
dimensions from the commencement.
The heading of a tunnel assists not only in the correct alignment of
the work, but furnishes at the same time an accurate knowledge of the
strata passed through. It is also of service for ventilation,
communication, and drainage.