In some cases the heading is driven at the bottom of the tunnel
section, as in Fig. 211, and in others at the top, as in Figs. 202 and 170
204. Many of the earlier tunnels were constructed on the former
system, while of late years the latter method has been very largely
adopted. The bottom heading may perhaps in some instances be more
efficacious for drainage, but it is very liable to be frequently
choked up when taking out the excavation to the full size, and the
lower surface is much cut up by the movement and conveyance of
materials. Another disadvantage arises from the necessity of removing
such a large amount of the cutting approaching the tunnel entrance
before a beginning can be made to the bottom heading. The top heading
has the advantage that it requires less removal of open cutting
previous to its commencement, and, being high up in position, there is
less chance of its being stopped up by falling material, the finished
excavations being carried out on the sides and below the heading.
Where the headings are cut through solid rock, stiff shale, or compact
chalk, little or no supports are necessary, but where they pass
through clay or loose material, timbering will be required for sides,
roof, and floor. Rough round poles, about 6 inches in diameter, are
generally used for verticals, and are firmly secured to transverse
sole-pieces, and on the top of these verticals strong transverse
top-sills are fastened by means of rough tenons or checks. Strong
boards are inserted at the back of this framework to keep the earth
from falling into the working. The distance apart of the verticals
will depend upon the description of material excavated; in very soft
places they will have to be placed very close together, but where
fairly sound and tenacious they may be placed at about 3-foot centres.
The excavated material must be conveyed away to the entrance of the
heading in small hand-trucks running on planks or light rails.
The widening out of the excavation to the full size will be a
repetition on a large scale of the work carried out in the heading,
with the difference that, the exposed surfaces being of so much
greater extent, extra care and precautions must be taken with the
framework and shoring of the timbering.
[Illustration: Fig. 202, 203]
The form and arrangement of the timbering, as well as the number,
sizes, and positions of the pieces, must be determined by the material
of the excavation and the contour line of the finished arching or
lining. The framework, which would be sufficient to support ordinary
soft material, must be largely augmented both in quantity and scantling 172
to meet the requirements for wet treacherous clay.