Railway Construction — John Stuart Mill — John Shaqi
Railway Construction
John Stuart Mill · en
Instances will occur where a cutting has to be made through a thick
bed of rock and several feet of soft loose strata underneath. The
effect of forming a cutting through the soft strata is to induce the
heavy bed of rock above to squeeze or force out the softer material
below, and unless proper means were taken to avert such a disturbance,
the entire cutting would have to be excavated to a very flat slope.
The method adopted in such a case is to build strong face-walls of
masonry, brickwork, or concrete, underneath the rock, as shown in Fig.
51, with strong inverts placed at short distances. Suitable
arrangements must be made to take away the drainage water which will
collect at the back of the walls, and weeping-holes or outlets must be
left in the lower part of the walls to convey the water into the
water-tables on the line.
Where there is a depth of earth cutting on the top of the rock, the
earth should be cut away so as to leave a bench or space of 3 or 4
feet between the edge of the rock cutting and the foot of the earth
slopes, as shown on Fig. 52.
In cases of shelving rock, with earth or clay on the top, as shown in
Fig. 53, it is frequently found necessary to remove the whole of the
clay on the high side to prevent the possibility of its sliding off
the rock on to the line below.
[Illustration: Fig. 52, 53, 54, 55, 56]
In large cuttings it is usual to push forward a gullet of sufficient
width for one or two lines of waggons, as shown in Fig. 54. When this
has advanced some distance, strong planks or half balks of timber are
placed across the gullet, and the sides or wings of the cutting can be
excavated, the material wheeled to the gullet, and tipped from the
barrows into the waggons beneath. By this arrangement the work can be
carried on very expeditiously, as one set of men can be engaged 65
advancing the gullet and laying the track, while others are following
up and taking down the sides. A large number of waggons can thus be
filled in a day, and a small locomotive kept fully employed.
Occasions will arise where the material from a large cutting, situate
on a continuous gradient, as in Fig. 55, has to be carried in both
directions to embankment.
In wet weather, or if the cutting is at all wet, it would be almost,
if not quite, impossible to carry on the excavation at the upper end
to the proper formation level. The water would collect at the lower
level, and not having any means of escape, except by pumping, would
stop the work. In such a case the best way is to take out the cutting
at the upper end to a slight rising gradient, as shown in the sketch,
sufficient to carry away all water, and afterwards take out the lower
portion in the working from the other end of the cutting.