The permanent way of these service roads is generally made as simple
as possible. A pair of movable rails are used instead of switches, as
shown in Fig. 60. These rails are linked together by iron tie-rods,
and pulled or pushed over into position for one or other of the roads 70
by means of the handle at A. A stout iron pin, or iron
clamping-plate, serves to retain the rails in position during the
passing of the waggons. In a similar manner, a short rail working on a
pin, or pivot, is made to answer the purpose of an ordinary crossing.
The rails are laid complete and continuous for the one road, and for
the second road the outer rail is laid sufficiently high to cross over
the rail of the first road. A piece of rail is then secured by a
centre pin, or pivot, to the cross-sleeper, as shown on Fig. 61. This
pivoted rail is pulled over into the position shown by the dotted
lines, to allow the passage of waggons on the one road, or pulled
across to the end of rail at B, for waggons to pass on or off the
other road. In the latter case an iron pin or clamp serves to keep the
pivoted rail in position. As these service roads are merely laid down
on the soft loose material brought forward for filling, they require
constant packing and lifting to prevent them working into depressions,
which might cause the waggons to leave the rails.
To indicate the height of the embankment filling, strong stakes or
poles must be firmly set in the ground at each chain-peg. On each of
these poles two cross-bars must be fixed, the lower one placed to the
correct height of the embankment, and the upper one to show the amount
allowed for subsidence. The excavated material, as brought from the
cuttings, is in a soft, loose condition, and an allowance must be made
for its settlement, or subsidence, as the embankment becomes
consolidated. This allowance will, of course, depend on the height of
the embankment and the quality of the material, but for ordinary earth
and clay it is customary to allow about one inch to the foot of
height, which is equal to about 8 per cent.
When forming embankments over very side-lying ground, it is necessary
to cut steps in the sloping surface on which the filling material has
to be placed, as shown in Fig. 62. These steps give a hold to the new
earthwork, and check the tendency to slide down the hillside.
Embankments have frequently to be carried over ground which is low,
soft, and wet, but not boggy. If the culverts and drains are
sufficiently large, and properly arranged, these places are not likely
to cause much future trouble.